×

fill rock meaning in Chinese

充填料

Examples

  1. Experiment on self - compacting concrete filling rock - fill
    自密实混凝土充填堆石体的试验
  2. Coupling analysis of high slope stability in water - filled rock by using fracture network seepage and distinct element
    裂隙网络渗流与离散元耦合分析充水岩质高边坡的稳定性
  3. In this paper , first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed , especially the relationships between gradation , strength and maximum dry density , long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn . by in - situ tests and researches on compacting mechanism of high - filled rock embankments , effecting factors on compaction , construction technology and shock compacting technology , obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction . by deeply research on the theory and methods of quality control of high - filled embankment , settled are the questions as quality detection method and control standard of high - filled rock embankment
    本文首先总结和分析了国内外公路和坝工行业已有的相关成果,深入探讨了填石料的工程性质与最大干密度、长期稳定性等之间的关系,得到了一些有益的结论;通过现场试验路堤的试验和对高填石路堤压实机理、填石路堤压实效果影响因素、施工工艺和冲击压实技术等研究,解决高填石路堤压实工艺和最优碾压参数控制等技术问题;通过深入研究填石路堤压实质量控制原理和方法,解决高填石路堤压实质量检测方法和控制标准技术难题;解决高填石路堤沉降观测技术问题,并根据沉降观测结果研究高填石路堤地基和路堤沉降变化规律,得到了能预测沉降变化规律的“龚帕斯”成长曲线预测模型;根据工程实际,深入研究了边坡稳定性的影响因素,得到了有益的结论。

Related Words

  1. pores filling
  2. ampoule filling
  3. filling date
  4. vein filling
  5. fill ratio
  6. filled system
  7. filled in
  8. filling block
  9. filled ground
  10. bulk filling
  11. fill resources
  12. fill right
  13. fill sails
  14. fill sb in on
PC Version

Copyright © 2018 WordTech Co.